Setup location
RC cement floor (factory rooftop or residence)
High and low point
Less than 1.5 meters
Module direction
Vertical / horizontal placement
Tilt angle
0-30 degree
Wind resistance level
Can resist winds up to category 15 and gusts up to category 17 Or designed according to the customer’s needs.
1
First stake out the anchoring rebar and place the assembled column on top.
2
Measure the tilt angle and adjust the column to the correct position. Place the longitudinal beam so that it passes through the fastener on the column and lock.
3
Use the steering piece to lock the steering beam on the cross beam.
4
Place the module and use a press block to press the top and lock the bottom to secure it to the bottom support.
Patent Certification
Among the component patent applications, some of them have obtained invention and new model patents in Taiwan, Japan, and Germany.